RedCore R-4 User Manual

Browse online or download User Manual for Unknown RedCore R-4. Installation Operation & Maintenance Guidelines

  • Download
  • Add to my manuals
  • Print
  • Page
    / 19
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Installation
Operation
& Maintenance
Guidelines
for KingspanWater
Polyethylene Rainwater
Harvesting Tanks
GL0115P-03 ISSUE 04: DECEMBER 2009
GRAVITY SYSTEM
Page view 0
1 2 ... 19

Summary of Contents

Page 1 - Guidelines

InstallationOperation & Maintenance Guidelinesfor KingspanWater Polyethylene Rainwater Harvesting Tanks GL0115P-03 ISSUE 04: DECEMBER 2009GRAV

Page 2 - Contents

13) Refer to the Guide Sheet DIAGRAM C. At this stage, the pump should not be in the tank. To install the pump you should take great care. It

Page 3 - 1 INTRODUCTION

14) Refer to the Guide Sheet DIAGRAM C. The depth sensor is a robust item but must not be subjected to excessive impact, crushing or stretching

Page 4

16) Set-up and commissioning. It is essential that these instructions are carried out before leaving the system with electrical power applied.

Page 5 - 3.4 TANK INSTALLATION

Gravity System Guide Sheet12

Page 6

135 WARRANTY Taken from ‘Kingspan’s Terms & Conditions of Sale’ The company will replace or, at its option, properly repair without charge any

Page 11

180 Gilford Road, Portadown, Co. Armagh, Northern Ireland, BT63 5LF Sales Hotline Tel: +44 (0) 28 3836 4444 Tel: +44 (0) 28 3836 4400 Fax: +44 (0)

Page 12

Contents 1 INTRODUCTION ... 022 HANDLI

Page 13 - Gravity System Guide Sheet

021 INTRODUCTION1.1 These guidelines represent Best Practice for the installation of the above units. Many years of specialist experience has led

Page 14 - HEALTH & SAFETY

033.2.7 DO:-3.2.8 Use the correct backfill material.3.2.9 Site the tank at the furthest practical location from habitable dwellings. Most building r

Page 15

04GENERAL CONCRETE SPECIFICATIONIN ACCORDANCE WITH BS EN 206-1 ( BS 8500-1)TYPE OF MIX (DC) DESIGNPERMITTED TYPE OF CEMENT BS 12 (OPC): BS 12 (RHPC)

Page 16

053.4.13 WET GROUND CONDITIONS:3.4.14 Excavate a hole to appropriate depth allowing at least 300mm for lean mix concrete and hard-core base. Allow

Page 17

064 SYSTEM INSTALLATION – (PLUMBING & ELECTRICAL)4.1 GRAVITY (HEADER TANK) SYSTEM INSTALLATION.4.1.1 Please refer to the GRAVITY SYSTEM Guide S

Page 18

07 6) Refer to the Guide Sheet DIAGRAM A. Lay in the MDPE pump outlet pipe according to your chosen route and ensure that bending radii are kep

Page 19

11) Refer to the Guide Sheet DIAGRAM C. The main electrical supply should come from either the Distribution Board, fused or with MCB Type C rat

Comments to this Manuals

No comments